Customization: | Available |
---|---|
After-sales Service: | 14 Days |
Warranty: | 14 Days |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item name | PTFE flask |
Sizes | 250ml/500ml/1000ml/2000ml/3000ml/5000ml Customization is accepted. |
Material | PTFE(Corrosion resistance, high and low temperature resistance and insulation) |
Highlights | 1. Different bottom shapes can be customized (Flat bottom, round bottom) 2. Low and high temperature resistance. :from -200ºC to +250ºC ( -328ºF ~ +482ºF ) 3. Low blank value of metal elements etc. 4. Corrosion resistance 5. There are threaded connections between the cover and the body and between each neck and the cover, which is convenient for disassembly and cleaning. 6. The PTFE flask has single neck, three neck and four necks, standard ports of 17, 19 and 24, and each standard port is equipped with a stopper |
Note | 1. Pad asbestos mesh when heating, or use other hot baths for heating.The liquid quantity shall not exceed 2/3 of the volume, not less than 1/3 of the volume; 2. When installing accessories (such as thermometers, etc.), appropriate rubber plugs should be selected, and special attention should be paid to check whether the air tightness is good; 3 distillation is best in advance at the bottom of the bottle to add a small amount of zeolite, in order to prevent boiling; 4. Heating should be placed on asbestos net, so that it is heated evenly; 5. After distillation, the piston must be closed first and then stop heating to prevent suction; |
MOQ | 3pcs per size |
Sample time | 7 working days (Mass production time: 30 working days after received your deposit.) |
Payment | 30%TT and the balance should be paid before delivery. |